"Professional Floor Installation & Restoration Services."
   
Basket [ 0 ]




Wood Floor SANDING
- Wood Floor Staining
- Wood Floor Gap Filling
- Wood Floor Repairs
- Wood Floor Finishes
Wood Floor INSTALLATION
- Types of Hardwood Flooring
- Fitting Recommendations
- Installation Methods
Wood Description
Flooring advice
Choosing Wood Flooring
Gallery
 
Unfinished Solid Oak Flooring
Tuscan Solid Wood Flooring
Prefinished Solid Oak Flooring
Artistico Engineered - Unfinished
Artistico Engineered - Oiled
Artistico Engineered - Lacquered
Tuskan Engineered - 1 strip
Tuskan Engineered - 3 strip
Tuskan Engineered - Elite
Oak Parquet Flooring
Krono Supernatural Classic
Krono Supernatural Narrow
Predesigned Floors
Borders
Medallions
Art Mosaic Panels
Oils
Wood Floor Underlay
DPM & Primers
Wood Floor Adhesives
Gap Fillers
Lacquers
Bona Naturale
Bona Sportive System
Stains & Colors
Maintenance
Mouldings and Skirtings
Wood Floor Sanders
European Walnut Worktops
Oak Worktops
Am. Black Walnut Worktops
Tiger Walnut Worktops
Beech Worktops
Iroko Worktops
Sapele Worktops
Cherry Worktops
Ash Worktops
Wenge Worktops
Zebrano Worktops
Upstands
 
Wood Floor Fitting Recommendations

Wood Floor INSTALLATION | Types of Hardwood Flooring | Wood floor Fitting Recommendations | Installation Methods

Handling And Storage.

It is essential that you unload your hardwood flooring in dry weather, never unload the flooring in the rain as the moisture could cause the planks to warp. Your wooden flooring should be stored in a dry place at room temperature and if possible should be raised off the ground (on a palette for instance). You should store your hardwood flooring in the room that it will be laid for a minimum of 72 hours (preferably a week) so that it has time to acclimatise to the moisture and temperature of the room.

Preparing To Lay Your Flooring.

The most dangerous enemy of the hardwood flooring is moisture; you must ensure that the sub-floor (i.e. concrete, plaster or timber) is dry. This is especially true when laying hardwood flooring in a new build property where concrete floors will still contain a high level of moisture. Your solid wood flooring should have been allowed sufficient time to acclimatise to the conditions of the room in advance of installation. Any timber - existing flooring, joinery or battens - should have a moisture content of no more than +2% above the moisture content of the new floor. It is advisable when laying on to existing timber that you ensure it is treated against fungal or insect attack. Concrete or screed should contain a damp proof membrane and have a moisture content of no more than 5%. This is in practice almost impossible to achieve and so additional precautions should be taken to prevent moisture reaching the new flooring. However, it is worth remembering that any new concrete or screed will take approximately 1 day per mm thickness or 1 month per 25mm of thickness to dry naturally to a moisture content of 5%. The deeper the concrete slab the longer the period, for example a 150mm slab will probably take 10-12 months to dry back to a safe moisture level. The ambient conditions in the room should lie somewhere in the range of 40-50% humidity and a temperature of 15 to 25°C at the time of laying the floor. Only order the floor when you are ready to lay it. Under no circumstances store it in a room that is wet or outside, or even in a garage where it could pick up moisture. Take the floor into the room in which it is to be laid in the optimum working conditions and allow it to adjust to the temperature for a minimum of 72 hours - preferably 1 week. True acclimatisation will take a few weeks and this is best done after the floor has been laid.

Allowing For Expansion.

All wood floors will expand and contract over the course of the year. Typically hardwood will expand across its width during the summer as the air becomes more humid and the wood takes in the moisture, and shrink during the winter when the heating dries out the air and removes moisture from the boards. Kiln drying to 8-10% moisture content will minimise excessive movement. A gap of 15mm to 20mm should be left around the floor to allow for expansion. However, a floor laid in winter that will expand in the summer may require additional expansion to be allowed across the width of the floor.

In General.

It is recommended your wooden flooring to be installed by a specialist. Do not give this responsible job to just someone, it may cause you a lot of headache and additional expenses afterwards.
Our team of professionals will provide with a services second to none, paying attention to the very last detail. Leaving you with wooden flooring which will completely meet your expectations. Give us a call or contact us via email. We know exactly what it needs to be done with your new hardwood flooring.

<<Types of Wood Flooring

↑ Back to the top ↑

Installation Methods>>

  Flooring Advice Centre     Terms Of Service     News & Highlights
Flooring-advice
Sitemap
Our Partners
 
Freqiently Asked Questions
Terms & Conditions
Areas We Cover
Fully Insured Cleaning Services
 
Terms & Conditions of Service
Areas We Cover
About us
 
This website is temporary unavailable.